References
Design and supply of complete water circuit for the flue-gas heat exchangers – II. supply stage. Waste heat from WFL 3 a WFL 4 hot forming line furnaces is transferred...
Rumburk, Benteler Automotive Rumburk s.r.o
2023
Full reference Basic project for waste heat recovery from pyrolysis furnaces flue gas. Output of Basic project is technical report containing result of enthalpy-mass balance calculations,...
Stráž nad Nisou, KNORR-BREMSE Systémy pro užitková vozidla ČR
2023
Full reference Thermal design for the part of ORC circuit.
Project range:
- Economizer thermal design - Recuperator thermal design - Technical report with attachments (inc. draft...
Plzeň, Doosan Škoda Power s.r.o.
2023
Full reference Processing of the technical report - balance of steam air heater of the boiler K3.
Project range:
- Creation of mass and enthalpy balance of air heater boiler...
Brno, SAKO Brno, a.s.
2023
Full reference Regular inspection of the air heater - oil heat exchanger, including cleaing at the Wienerberge s.r.o. facility, Stod.
Stod, Wienerberger s.r.o., České Budějovice
2022
Full reference A study of changing the heat source to hot water and indirect heaters with natural gas/light fuel oil dual-fuel burners for air heating in a wet paint booth.
Žamberk, Bühler CZ s.r.o.
2022
Full reference Heating of the glycol mixture of the pyrolysis gas cooler + pump group in backup boiler room Zlín - Malenovice in Teplárna Otrokovice a.s. company.
Zlín - Malenovice, ESAP Consult s.r.o., Ostrava
2022
Full reference The exhaust of cataphoretic surface coating technology and connection to the flue gas heat exchanger.
Rumburk, Benteler Automotive Rumburk s.r.o.
2022
Full reference Manufacturing documentation of lifting device with maximum load of 40 tons.
Jihlava, KRONOSPAN CR, spol. s r.o.
2016
Full reference